CONSTRUCTION OF THE MARROZOS TUNNEL

Location

Boqueixon-Coruña, A. Galicia. Spain

Name

Construction of the Marrozos Tunnel

Operation

Geotúnel

Main Details

1,100.00 m long tunnel with free section of 157.00 m2 corresponding to the Santiago-Boqueixón section

Technical Specifications

Excavation 172,300 m³ - air-blown concrete 8,900 m³ - Bolting 20,400 metres - Trusses 540,000 Kg - Micropiles 7,600 metres