• 21.43  m3 concrete in foundations
  • 52.33  m3 concrete in walls
  • 80.00  unit pillars and luminaire
  • 607.05  m2 hydraulic paving stones
  • 159.29  ml perimetral footing
  • Anterior
  • Siguiente
Grupo Moyua,www.moyua.com

CONSTRUCTION OF THE PARK MEMORIAL GARDEN PHASE I

Location

Donostia-San Sebastian. Guipuzcoa. Spain

Budget

€1,633,901.57

Project deadline

4 months

Name

Construction of the Park Memorial Garden Phase I

Client

Donostia-San Sebastian City Council

Main Details

Construction area 21,496 m2 between  the new district of Riberas de Loiola and the district of Amara, next to the Rafael Moneo Church  - Creation of a topographical mountainous shape with 30,000 m3 of land movement - Multipurpose sports area with two multidisciplinary pitches .

Technical Specifications

35.20 ml drainage - 21.43 m3 concrete in foundations - 52.33 m3 concrete in walls - 1.00 unit insertion of metallic walkway - 29.02 m2 laminate flooring - 47,74 ml metallic handrail - 7,000 ml channelling and piping in service networks - 502.30 ml draining paving - 80.00 unit pillars and luminaire - 8,139.00 unit supply, plantation and transplant of diverse species - 1,374.19 m3 sub-base and base of artificial gravel - 5,888.81 m2 concrete flooring - 632.40 m2 concrete flooring on sports tracks - 1,797.75 ml bordillos - 607.05 m2 hydraulic paving stones - 4,780.97 m2 sand coloured concrete asphalt - 453.99 m2 asphalt mixtures - 159.29 ml perimetral footing.

 



We use our own and third party cookies, for the analysis of user navigation. If you continue browsing, we consider that you accept the use.
You can change the settings or get more information here.

© 2011 Grupo Moyua. All rights reserved.
Website developed by DMacroWeb using the tool DM Corporative
Share:
Info: