CONSTRUCTION OF THE PICO DE SIERO TUNNEL (TAV LEON-ASTURIAS)

Location

Pola de Lena. Asturias. Spain

Name

Construction of the Pico de Siero Tunnel (TAV Leon-Asturias)

Operation

Geotúnel

Main Details

1,450.00 metres long tunnel belonging to the TAV Leon-Asturias construction works - section 117 m²

Technical Specifications

Excavation 170,000 m³ - air-blown concrete 17,000 m³ - Bolting 58,000 metres - Trusses 1,230,000 Kg - Micropiles 13,500 metres



We use our own and third party cookies, for the analysis of user navigation. If you continue browsing, we consider that you accept the use.
You can change the settings or get more information here.

© 2011 Grupo Moyua. All rights reserved.
Website developed by DMacroWeb using the tool DM Corporative
Share:
Info: