Location | Redondela. Pontevedra. Galicia. Spain |
Name | Construction of the Redondela Tunnel and Utility Tunnels |
Operation | Geotúnel |
Main Details | Bi-directional tunnel for rail traffic 2,412.00 metres long and section type of 125 m², with additional utility tunnel of 570 metres and 30 m² section |
Technical Specifications | Excavation 322,000 m³ - air-blown concrete 15,000 m³ - Bolting 90,000 metres - Trusses 770,000 Kg - Micropiles 29,000 metres |