CONSTRUCTION OF THE RELLÓN TUNNEL ON THE CANTABRIAN DUAL CARRIDGEWAY

Location

Luarca. Asturias. Spain

Name

Construction of the Rellón Tunnel on the Cantabrian Dual carridgeway

Operation

Geotúnel

Main Details

A 2 Tube road tunnel, 280 metres each and a 128 m² section belonging to the A-8 Cantabrian Dual Carridgeway

Technical Specifications Excavation 74,000 m³ - air-blown concrete 3,050 m³ - Bolting 13,600 metres - Trusses 185,000


We use our own and third party cookies, for the analysis of user navigation. If you continue browsing, we consider that you accept the use.
You can change the settings or get more information here.

© 2011 Grupo Moyua. All rights reserved.
Website developed by DMacroWeb using the tool DM Corporative
Share:
Info: