• 345  metres of breakwater
  • 50,983  m³ dredging
  • 22,871  m³ of H-175 reinforced concrete in the barrier
  • 23,228  tonnes of 20 tm blocks
  • 79,530  tonnes of 40 tm blocks
  • Anterior
  • Siguiente
Grupo Moyua,www.moyua.com

IMPROVEMENT OF MARITIME ACCESS TO ORIO PORT

Location

Orio. Guipuzcoa. Spain

Budget

€11,174,350.00

Project deadline

18 months

Name

Improvement of Maritime Access to Orio Port

Client

BASQUE GOVERNMENT- Ports

Main Details

Length of the main breakwater's left side 345 metres - Crest elevation of the barrier +15.50 - Traffic direction on the internal side of the elevation +6.50 of 4.50 metres wide - Length of the right side breakwater channel  105 metres - Channel width 66 /87 metres.

Technical Specifications

473,991 tonnes of 5/500 kg rockfill - 50,983 m³ of dike site dredging  - 65,046 tn of edgeways rockfill 1/3 tm - 44,521 tonnes edgeways rockfill 2/6 tm - 23,228 tonnes of 20 tm blocks - 17,307 tonnes of 30 tm blocks - 79,530 tonnes of 40 tm blocks - 52,793 tonnes of 62 tm blocks - 3,126 m² of rough masonry - 29,007 m³ of filling in the explanade - 22,871 m³ of H-175 reinforced concrete in the barrier.

 



We use our own and third party cookies, for the analysis of user navigation. If you continue browsing, we consider that you accept the use.
You can change the settings or get more information here.

© 2011 Grupo Moyua. All rights reserved.
Website developed by DMacroWeb using the tool DM Corporative
Share:
Info: