• 18  km of excavation of ditches for pipes
  • 585.81  M3 of gabions retaining wall
  • 11,340  ML of kerbs
  • 814,427  M2 area audited for urbanisation in Sector 19
  • 3,898  M2 of flagstone and granite paving
  • 18,440  ML rainfall drainage networks
  • 3,898  M2 of flagstone and granite paving
  • 450.00  M3 of reinforced concrete in construction work.
  • Anterior
  • Siguiente
Grupo Moyua,www.moyua.com

PHASE I URBANISATION OF SECTOR 19 OF VITORIA-GASTEIZ

Location

Vitoria. Álava. Spain

Budget

€20,801,300

Project deadline

5 months

Name

Phase I Urbanisation of Sector 19 of Vitoria-Gasteiz and urbanisation of the Local Youth Body in Arechavaleta and Gardélegui

Client

Ensanche 21

Main Details

814,427 M2 area audited for urbanisation  on Sector 19 composed of an internal road network lengthened by 14 roads joined by roundabouts, and  which extends towards the South  of the city with regular and uniform blocks, and edge roads which link existing streets or avenues, joining each area with surrounding neighbourhoods and other areas of the city, alternating streets used for traffic roads and co-existing pedestrian-vehicle streets. In each one of these roads, underlying infrastructures will be  carried out  in order for the new sector to work.

Technical Specifications

134,629.34 M3 extraction of vegetation layer    - 205,674.22 M3 creation  of embankment and causeway - 431,214.93 M3 of open air excavation  - 81,712.90 M3 of filling with vegetation cover - 18 km of excavation of ditches for pipes - 39,160.32 M3 creation of improved explanade - 585.81 M3 of gabions retaining wall - 17,183 ML of electrical and lighting channels - 18,440 ML rainfall drainage networks  - 14,328 ML networks of sewage and waste water- 14,784 Ml network of drinkable water supply 75,033 M2 of plain concrete slabs HM-20 - 77,870 M3 of granular bases - 11,340 ML of kerbs - 3,898 M2 of flagstone and granite paving - 20,028 M2 of continous printed concrete paving - 24,470 tonnes of hot asphalt cement - 450.00 M3 of reinforced concrete in construction work.

 



We use our own and third party cookies, for the analysis of user navigation. If you continue browsing, we consider that you accept the use.
You can change the settings or get more information here.

© 2011 Grupo Moyua. All rights reserved.
Website developed by DMacroWeb using the tool DM Corporative
Share:
Info: