• Nautical  Sports Dock
  • Orio
  • 376  berths
  • More  than 1,200 m3 of reinforced concrete
  • 4,476  kg of 100 - 200 kg rockfill as a protective layer
  • 13,335  m2 asphalt paving on internal roads and car parks
  • 4,497  ml of electrical channels
  • Anterior
  • Siguiente
Grupo Moyua,www.moyua.com

REFORMATION Nº 2 OF THE ORIO NAUTICAL SPORTS DOCK

Location

Orio. Guipuzcoa. Spain

Budget

€8,298,968.53

Project deadline

14 months

Name

Reformation Nº 2 of the Orio Nautical Sports Dock

Client

BASQUE GOVERNMENT- Ports

Main Details

376 berths for different vessels - 4 holding docks - 4 administration buildings - 1 300 m2 covered warehouse - 320 m2 Technical area - 700 ml of jetties 2 metres wide - 44 ml of jetties 3 metres wide - 193 units of rectangular fingers.

Technical Specifications

4,476 kg of rockfill 100-200 kg as a protective  layer - 102,616 m³ of site dredging  - 77,191 m3 of excavations on all kinds of terrain - 6,061 m2 ABED type metallic sheet piles for quay creation - 70,167 kg of steel in shapes and elements - 2,341 ml of TITAN 40/16 anchors - 1,229 m3 of reinforced concrete  NA-25 in walls  and structural elements - 51,712 kg of B-500S reinforcing steel - 1,658 m2 of rough masonry - 13,335 m2 asphalt paving on internal roads and car parks - 14,444 m2 of different types of paving in urban pedestrian zones - 4,497 ml of electrical channels - 813 ml of supply channels - 804 ml sewage network  - 524 ml drainage network.

 



We use our own and third party cookies, for the analysis of user navigation. If you continue browsing, we consider that you accept the use.
You can change the settings or get more information here.

© 2011 Grupo Moyua. All rights reserved.
Website developed by DMacroWeb using the tool DM Corporative
Share:
Info: