| Project and reconstruction work to restore take-off and landing strips and the depot areas at the USIMINAS airport. | |
| Location | Santana do Paraiso. Minas Gerais. Brazil |
| Budget | 6,500,000 Reales |
| Project deadline | 4 months |
| Client | Minas Gerais Iron and Steel Industries (Usiminas) |
| Main Details | 90,000 M2 take-off and landing strip, 2,000 m long and 45 m wide, two aircrafts depots of 10,260 m2; the depot requiring solid concrete paving, and the other flexible asphalt paving. |
| Technical Specifications | 3,778.91 M3 milled flexible asphalt paving - 3,778.91 M3 of extended freight and compression of milled material adapted for use as an airport runway - 103,147.44 M2 of interface paint with asphaltic emulsion - 12,688.96 tonnes of bituminous mixes - 400 m of treatment and repair of cracks in the concrete paving. 12,000 M2 of paint for the horizontal signaling on the runway and in the depots. |