• 3,988  M3 de reinforced concrete in structural elements
  • 7,250  Ml of ground anchorage of 40 tn
  • 17,980  M3 Rock excavation
  • 1,335  M2 in ceilings and suspended ceilings
  • 2,273  M2 structures
  • 11,137  M2 of horizontal tiling
  • 13,222  M2 vertical plaster tiling
  • 9,260  M2 of different types of demolition
  • 2,273  M2 structures
  • 2,421  M2 ceramic tile roofing
  • Anterior
  • Siguiente
Grupo Moyua,www.moyua.com

RESTORATION OF THE SAN TELMO MUSEUM

Location

Donostia-San Sebastian. Guipuzcoa. Spain

Budget

€14,633,716.91

Project deadline

26 months

Client

Donostia-San Sebastian City Council

Name

Restoration and Extension of the San Telmo Museum in Donostia-San Sebastian

Main Details

5,250 M2 of built-up area in expansion - 5,817 M2 of renovated area - 4,692 M2 extension of usable surface area - 4,227 M2 restoration of usable surface area

Technical Specifications 3,988 M3 de reinforced concrete in structural elements - 512 Tn of corrugated steel B500S in structural elements - 3,926 M2 of concrete flooring HA-25  - 7,250 Ml of ground anchorage of 40 tn - 9,260 M2 of different types of demolition - 17,980 M3 Rock excavation - 2,050 M2 of panels and factories in internal divisions - 6,688 M2 of vertical panelling - 1,335 M2 of ceilings and false ceilings - 2,421 M2 of ceramic roof tiling - 11,137 M2 horizontal panelling - 2,273 M2 frameworks - 13,222 M2 plastering vertical panelling


We use our own and third party cookies, for the analysis of user navigation. If you continue browsing, we consider that you accept the use.
You can change the settings or get more information here.

© 2011 Grupo Moyua. All rights reserved.
Website developed by DMacroWeb using the tool DM Corporative
Share:
Info: