• Arteako  Tunnel of 330 ml and 6.40 m of interior radius for a double track
  • 1,353,422  m3 of excavation
  • 9,953  Tn of steel B500S corrugated in structures
  • 94,400  m3 of structural concrete
  • 1,219  Tn of special steel for prestressing in structures
  • 5,030  Ml of platform building work for a high speed double track
  • 1,770  Ml stretch of viaduct separated into 5 viaducts
  • Anterior
  • Siguiente
Grupo Moyua,www.moyua.com

TAV VITORIA-BILBAO-SAN SEBASTIAN. STRETCH: AMOREBIETA-ETXANO

Location

Amorebieta. Biscay. Spain

Budget

€67,998,539.00

Project deadline

27 months

Name

Construction of the High Speed Line Platform from Vitoria-Bilbao-San Sebastian. Stretch: Amorebieta-Etxano

Client

ADIF. RAILWAY INFRASTRUCTURE ADMINISTRATOR

Main Details

5,030 Ml  of platform constructed for a double track of high speed - 1,770 Ml  stretch of viaduct separated into 5 viaducts - 1,550 Ml stretch in a tunnel or an artificial tunnel in 2 artificial tunnels  and 2 conventional tunnels - 2 overpasses

Technical Specifications Arteako Tunnel 330 ml and 6.40m of interior radius for a double track (85 m2 section) - Orranpe Tunnel 505 ml and 6.40m of interior radius for a double track (85 m2 section) - Artificial ErribasoTunnel 330 ml for a double track (85 m2 section) - Artificial Arizbakarra Tunnel 385 ml for a double track (85 m2 section) - Arkotxa Viaduct 162 ml  and 14ml width, direct foundations and double edge beam trough panel 2.40ml + slabs in situ - San Antonio Viaduct 837 ml   and 14ml width, foundation using piles in situ 1,500 mm in diameter  and double edge beam trough panel 2.40ml + slabs in situ - San Lorenzo Viaduct of 117 ml  and 14ml width, direct foundations  and double edge beam trough panel 2.40ml + slabs in situ - Leguinetxe Viaduct 260 ml   14 ml wide, foundation with piles in situ of ø 1.500 mm and double edge beam trough panel 2.40ml + slabs in situ - Ibaizabal Viaduct 394 ml  and 14ml width, foundation with piles in situ ø 1,800 mm and an incrementally launched panel single-cell box-girder edge in situ edgeways 4.8 metres - Two overpasses 45 ml and 8.20 ml wide, direct foundations and a slab panel in situ of reinforced concrete edgeways 1.00 ml - 1,353,422 m3 of excavation - 370,123 m3 of embankment and filling - 9,953 Tn of steel B500S corrugated in structures - 1,219 Tn of special steel for prestressing in structures - 94,400 m3 of structural concrete


We use our own and third party cookies, for the analysis of user navigation. If you continue browsing, we consider that you accept the use.
You can change the settings or get more information here.

© 2011 Grupo Moyua. All rights reserved.
Website developed by DMacroWeb using the tool DM Corporative
Share:
Info: