• 2,040  metres of motorway - 3,890 metres of branches
  • Trunk  road of two lanes in each 3.5mts wide road and 2.5 mts of hard shoulder
  • 579,710  m3 of clearing excavation - 240,380 m3 of compact filling
  • Tunnel  1,160 metres long
  • Anterior
  • Siguiente
Grupo Moyua,www.moyua.com

VITORIA/GASTEIZ - EIBAR MOTORWAY. STRETCH: ARRASATE - BERGARA

Location

Eibar. Guipuzcoa. Spain

Budget

40,324,252.00 €

Project deadline

22 months

Client

PROVINCIAL COUNCIL OF GUIPUZCOA

Name

2,040 metres of Motorway - 3,890 metres of branches of one and two lanes - Trunk road of two lanes in each 3.5mts wide road and 2.5 mts of hard shoulder with 1 metre verges - Branches of one road with 4 mts wide lanes and hard shoulders; internal 1 metre and external 2.5 metres - Branches of two roads with variable lanes between 7 and 40 metres wide, 1.5 metres hard shoulders and 1 metre verges

Main Details 66 kilometres of road to repair/construct
Technical Specifications 579,710 m3 of clearing excavation - 240,380 m3 of compact filling - 826,883 m3 in the form of spillways - 15,423 m2 of presplitting in rock - 2 mixed viaducts of steel and reinforced concrete - 3 prestressed concrete viaducts - 2 walls of rockfill - 1 wall of reinforced earth - 10,762 m3 de HA - 1,460,146 kg reinforcing steel - 1,238,860 kg of steel to prestress - 1,122,431 kg of steel in sheets and forms - 1 tunnel 1,160 metres long with two roads with a section radius of 7.07 mts and centre 1.41 mts, two 3.50 mts lanes, two 2.50mts hard shoulders and two 0.70 mts pavements, with a clearance of 5 metres constructed following the Austrian method of air-blown concrete, bolts and trusses


We use our own and third party cookies, for the analysis of user navigation. If you continue browsing, we consider that you accept the use.
You can change the settings or get more information here.

© 2011 Grupo Moyua. All rights reserved.
Website developed by DMacroWeb using the tool DM Corporative
Share:
Info: