| Location | Vitoria-Gasteiz. Ãlava. Spain. |
| Budget | €57,722,846.00 |
| Project deadline | 26 months |
| Client | Provincial Council of Guipuzcoa |
| Name | Vitoria/Gasteiz-Eibar Motorway. Stretch: Bergara (North) - Eibar Phase A |
| Main Details | 4,880 metres of motorway - Bergara part-interchange - Trunk road of two lanes in each 3.5mts wide road and 2.5 mts of outside lane hard shoulder, inside lane of 1 metre and 1 metre verges - Road in bidirectional branches on the part-interchange, of 7 metres, and 4 metres in forked branches. |
| Technical Specifications | 1,150,000 m3 of clearing excavation - 1,050,000 m3 of compact filling - 1,105,000 m3 in the form of spillways - 95,500 tn of hot bitumen mixes - 27,500 m3 of compacting artificial gravel - 2 double tunnels of 1,220 and 2,370 mts long c/u - 1 Viaduct of prestressed concrete in the part-interchange, 125 mts long (35-55-35) and 10 mts wide - 3 HA underpasses - 2 artificial tunnels of 35 mts - Naturally finished walls - Concrete prefabrications - Transverse drainage works of reinforced and prefabricated concrete - 13,400 m3 of concrete - 940,000 kg of reinforcing steel - 43,700 kg of prestressing steel. |