• 4,880  metres of motorway
  • 4,880  metres of motorway
  • Viaduct  of prestressed concrete. Length: 125 m, width: 10 m
  • Viaduct  of prestressed concrete. Length: 125 m, width: 10 m
  • 940,000  kg of reinforcing steel
  • 43,700  kg of prestressing steel
  • 1,150,000  m3 of clearing excavation - 1,050,000 m3 of compact filling
  • 2  artificial tunnels of 35 mts
  • Anterior
  • Siguiente
Grupo Moyua,www.moyua.com

VITORIA/GASTEIZ - EIBAR MOTORWAY. STRETCH: BERGARA - EIBAR

Location

Vitoria-Gasteiz. Álava. Spain.

Budget

€57,722,846.00

Project deadline

26 months

Client

Provincial Council of Guipuzcoa

Name

Vitoria/Gasteiz-Eibar Motorway. Stretch: Bergara (North) - Eibar Phase A

Main Details

4,880 metres of motorway - Bergara part-interchange - Trunk road of two lanes in each 3.5mts wide road and 2.5 mts of outside lane hard shoulder, inside lane of 1 metre and 1 metre verges - Road in bidirectional branches on the part-interchange, of 7 metres, and 4 metres in forked branches.

Technical Specifications

1,150,000 m3 of clearing excavation - 1,050,000 m3 of compact filling - 1,105,000 m3 in the form of spillways - 95,500 tn of hot bitumen mixes - 27,500 m3 of compacting artificial gravel - 2 double tunnels of 1,220 and 2,370 mts long c/u - 1 Viaduct of prestressed concrete in the part-interchange, 125 mts long (35-55-35) and 10 mts wide - 3 HA underpasses - 2 artificial tunnels of 35 mts - Naturally finished walls - Concrete prefabrications - Transverse drainage works  of reinforced and prefabricated concrete - 13,400 m3 of concrete - 940,000 kg of reinforcing steel - 43,700 kg of prestressing steel.