• 8,761  m long trunk road with three lanes
  • 1,136,911  M3 of excavation into rock with blasting
  • Viaduct  of 1,020 metres
  • Viaduct  of 176 metres
  • 15,937  TN of corrugated B500 steel
  • 148,500  M3 of structural concrete
  • 3,998,586  M3 of non-classified excavation
  • 30,211,461  M3 of embankment or causeway
  • 13  overpasses - 5 underpasses - 9 retaining walls
  • Triple  road tunnel of 3.50 metres per lane, 380 m long with a vertical clearance of 5.50  m
  • Vitoria/Gasteiz-Eibar  Motorway. Stretch: Eskoriatza - Arrasate
  • Anterior
  • Siguiente
Grupo Moyua,www.moyua.com

VITORIA/GASTEIZ - EIBAR MOTORWAY. STRETCH: ESKORIATZA - ARRASATE

Location

Arrasate. Guipuzcoa. Spain.

Budget

€121,177,244.00

Project deadline

36  months

Client

Bidegi

Name

Vitoria/Gasteiz-Eibar Motorway. Stretch: Eskoriatza (North) - Arrasate (North).

Main Details

8,761 Ml length of trunk road with a three lane section, 3.50 metres per lane, external hard shoulders of 2.50 metres and internal hard shoulders of 1.50 metres and two main sliproads  of 8 and 7 roads - Viaduct of 1,020 metres, width 14-21 metres, light-weight concrete bevelled with piled foundations - Viaduct of 176 metres, variable width, tightened with direct foundations - Viaduct of 80 metres, width 11.50 metres, of light-weight concrete and constant edging with direct foundations - Viaduct of 86 metres, width 11.95 metres, of light-weight concrete and constant edging with piled foundations - Viaduct of 60 metres, variable width, of light-weight concrete and constant edging with deep foundations - A triple road tunnel  of 3.50 metres per lane, 419 metres with a vertical clearance of 5.50 metres - A triple road tunnel of 3.50 metres per lane, 380 metres long  with a vertical clearance of 5.50 metres - A false tunnel of 193 metres with a 12 metres width  and  a vertical clearance of 5.50 metres - Thirteen overpasses - Five underpasses - Nine retaining walls  of different types.

Technical Specifications

3,998,586 M3 of non-classified excavation - 30,211,461 M3 of embankment or causeway - 1,136,911 M3 of excavation into rock with blasting  - 15,937 TN of corrugated B500 steel in structures - 1,843 TN of special prestressing steel - 148,500 M3 of structural concrete - 118,200 TN of HBM.

 



We use our own and third party cookies, for the analysis of user navigation. If you continue browsing, we consider that you accept the use.
You can change the settings or get more information here.

© 2011 Grupo Moyua. All rights reserved.
Website developed by DMacroWeb using the tool DM Corporative
Share:
Info: